1910 Crown Park Court Columbus, OH 43235
 BWC Tower HVAC Upgrade
BWC Tower HVAC Upgrade

Elevated platforms on the 13th floor and on the roof, design of 3000 gallon condenser water storage steel tank, framing support for the tank, five (5) 750 ton chiller platforms. 34th floor roofing openings and lifting crane steel framing support for air handling units/water cooling towers. Upgrade and commissioning were provided.