Camp Perry, Trippe Lot, Parking Lot
Project was undertaken to rehabilitate Trippe Road at the Camp Perry Armory. Roadway was rebuilt to accommodate heavy vehicle traffic. Parking Lot #1 was reconstructed and expanded, including the addition of a new entrance /exit drive to facilitate truck circulation. Existing pavement was removed and new pavement was installed and new catch basins. Drainage was a major factor in design , because of the limited storm system on base. Scope also included curbs, estimation, schematic design, construction documents and construction administration.
Civil: ADA compliance, pavement evaluation/design, geotechnical investigations, survey and drainage design.