1910 Crown Park Court Columbus, OH 43235
Wright State University Water Line Upgrades
Wright State University Water Line Upgrades

Phase 1:
Technical evaluation of the water supply, treatment and distribution options available to WSU development and calibration of a hydraulic model of the existing WSU water distribution system technical evaluation of WSUís existing and future systems using the hydraulic model evaluation of using City of Fairborn water in lieu of WSUís current well supply and water treatment system development of a rehabilitation, replacement, and/or decommissioning program to support the selected water supply alternative

Phase 2:
Design of new and replacement waterlines for the main campus of WSU